Home›News›October 14, 2026
TODAY · INFRASTRUCTURE · DAY 157

🚰 CM Vijay Lays Foundation for ₹3,108 Crore Chennai Ring Main Water Project

⏱ 3 min read · 566 words

CM Vijay laid the foundation stone at Sholinganallur for a ₹3,108.55 crore ring main that will link Chennai’s reservoirs, treatment plants and desalination plants into one network so water can be moved to any area facing a shortage.

📅 October 14, 2026 · Day 157 in Office · Chennai

தமிழில் படிக்க ›

Chief Minister C. Joseph Vijay laid the foundation stone on Wednesday, October 14, 2026, for the ₹3,108.55 crore Chennai Ring Main project at the Chennai Metropolitan Water Supply and Sewerage Board’s pumping station in Sholinganallur (DT Next, Maalai Malar, Social News XYZ / IANS).

The project will join Chennai’s drinking water sources into a single loop, so that water from any reservoir, treatment plant or desalination plant can be sent to whichever part of the city needs it.

₹3,108.55 CrProject cost
9Water sources linked
1,762 MLDDesign capacity
2031Target completion

The Problem It Solves

Chennai’s 91 lakh residents get about 1,260 million litres of water a day through 143 distribution stations (DT Next). Today, each reservoir and treatment plant feeds the city through its own separate main. If one source fails or runs short, there is no way to reroute surplus water from another source to the affected areas (DT Next, IANS).

What Will Be Built

SourceType
Poondi, Puzhal (Red Hills), Cholavaram, Chembarambakkam, Kannankottai–Thervoy KandigaiReservoirs feeding the treatment plants (incl. Krishna water)
Five water treatment plantsTreated surface water
Minjur, Nemmeli (two)Seawater desalination — working
Perur (400 MLD)Seawater desalination — under construction

Funding and Timeline

The project is funded with assistance from the Asian Development Bank and will be carried out by Chennai Metrowater. Work is to be completed within about four and a half years, by 2031 (DT Next, Maalai Malar).

At the Site

Vijay studied the project drawings, asked officials about its technical features, planted saplings at the pumping station and greeted people who lined the route (Maalai Malar).

Why It Matters

The ring main is the long-term answer to the problem Chennai faces every summer and in every flood: one source runs low or goes out of service, and whole neighbourhoods go dry while water sits unused elsewhere. Coming a day after reports that Andhra Pradesh will release more Krishna water to the city, it shows a two-track approach — securing more water now and building a network that can share it fairly across all of Chennai.

📰 Related

Sources: DT Next; Maalai Malar; IANS / TenNews; Daily Thanthi; Social News XYZ.

Chennai Water Ring Main Metrowater ADB Sholinganallur Day 157

📲 Get CM Vijay updates first
Daily news, schemes and by-election results — free.
WhatsApp channelTelegram
✏️ Spotted an error?
We check every report and fix mistakes openly.
Report a correctionCorrections policy ›
← All News